Turnkey solutions

Vehicle assembly plants, designed and delivered

We plan, equip, install and commission complete SKD and CKD production lines, then train your team to run them. You provide the land, building and utilities. We deliver a working line.

40+ yearsAutomotive manufacturing experience

SKD & CKDAssembly and full manufacturing lines

≤ 50,000Units per year plant capacity

NigeriaReference plant installed and running

Why assemble locally

Lower duties, local jobs, a vehicle brand of your own

In many emerging markets, import duty on CKD kits is under 10%, while complete vehicles (CBU) pay 35% or more. For new energy vehicles, some countries set duties on assembly equipment and kits close to zero.

  • Pay far less duty than importing complete vehicles
  • Qualify for local-content incentives and government fleet tenders
  • Build skills and employment in your own country
  • Grow from SKD to full CKD manufacturing as volume rises
Workers on the final assembly line at the Nigeria plant

Plant models

Choose the scale that fits your market

Indicative figures to help you plan. We size every plant to your volume, models and budget.

Entry

SKD assembly

≤ 5,000 units / year

Investment up to about US$1 million

  • Painted bodies arrive ready for trim and final assembly
  • Fastest route to local production
  • Compact footprint and small team

Most requested

CKD manufacturing

≤ 30,000 units / year

Investment up to about US$12 million

  • Welding, painting and assembly in your plant
  • Higher local content and lower duties
  • Typical for Africa and Central Asia

Large scale

CKD high volume

≤ 50,000 units / year

Investment up to about US$30 million

  • Full process lines with digital production management
  • Common capacity for Middle East projects
  • Built to expand with new models

Our scope

Everything inside the factory walls

Plant and process design

Layout, process flow, station planning and production schedule for your models and volume.

Equipment and tooling

Procurement of the full line plus manufacture of jigs, fixtures and tooling.

Installation and calibration

Our engineers install and calibrate every line on site.

Commissioning

Trial production, troubleshooting and debugging until the line runs to specification.

Training

Engineers and operators learn to manage the line and carry out each production process.

After-sales service

On-site support, spare parts and remote help once production starts.

Not included: land, factory buildings and public utilities such as water supply and the power network. These are arranged by the client.

Case study

Nigeria: 15-seat van assembly plant

TJ Autos supplied and installed an SKD assembly line for high-roof 15-seat passenger vans in Nigeria. Our engineers set up each station, ran the first builds with the local team and trained them through final inspection and wheel alignment.

2016Line installed and commissioned

15-seat vansModel assembled

Full lineBody, paint, assembly, inspection

Local teamTechnicians and operators trained

Assembled van on a lift at the Nigeria plant
Nigeria

Project path

How a plant project runs

Stage 1

Feasibility

Market, models, target volume, budget and site review.

Stage 2

Design & quotation

Floor plan, equipment list and project schedule.

Stage 3

Manufacture & ship

Equipment and tooling built, tested and shipped.

Stage 4

Install & commission

On-site installation, calibration and trial builds.

Stage 5

Train & support

Operator training, kit supply and after-sales.

Compare

SKD or CKD?

Process in your plantSKDCKD
Body weldingChinaLocal
PaintingChinaLocal
Trim and final assemblyLocalLocal
Testing and inspectionLocalLocal
Typical capacity≤ 5,000 / year≤ 50,000 / year
Local contentLowerHigher

Planning a plant?

Share your country, target models, annual volume and budget. Our engineering team will come back with a first proposal.